Customs Broker & Logistics, Chennai
R K Container Movers Pvt. Ltd. logo R K Container MoversPvt. Ltd. Get a quote

Home / Blog / Customs clearance

EPCG and Advance Authorisation: Importing Duty-Free as an Exporter

Workers operating machinery on a factory floor

For a manufacturer that exports, customs duty on imported machinery and raw materials can lock up a large amount of working capital. India’s Foreign Trade Policy offers two schemes that remove much of this burden: the Export Promotion Capital Goods (EPCG) scheme for machinery, and Advance Authorisation for inputs. Both allow duty-free imports in return for a commitment to export.

R K Container Movers Pvt. Ltd. clears imports under both schemes for exporters in and around Chennai. This guide explains how each scheme works, what the obligations are and the practical points that decide whether the benefit stays with you or turns into a liability.

EPCG: duty-free capital goods

What it covers

The EPCG scheme allows the import of capital goods at zero customs duty for use in producing goods or services for export. Capital goods can include machinery, plant, equipment, components, spares, tools, moulds, dies and similar items needed for production.

The export obligation

In return, the authorisation holder must export goods or services worth six times the duty saved on the imported capital goods, within six years from the date the authorisation is issued. The obligation is split into blocks, with a minimum share to be met in the first block of years, and the rest by the end of the period.

There is also an average export obligation: the exporter must maintain their usual level of exports, based on the average of previous years, in addition to the specific obligation under the scheme. Only exports above this average count towards the specific obligation.

Domestic sourcing benefit

If the capital goods are bought from Indian manufacturers instead of imported, the specific export obligation is reduced, which encourages local sourcing.

Important conditions

  • No second-hand goods. Used capital goods cannot be imported under EPCG.
  • Installation certificate. The holder must submit a certificate confirming the machinery has been installed at the declared premises within the prescribed time after import.
  • Actual user condition. The goods must be used by the holder for the approved purpose and cannot be sold or transferred until the obligation is met.
  • Nexus with exports. The capital goods must be connected to the export product, often shown through a Chartered Engineer certificate.

Advance Authorisation: duty-free inputs

What it covers

Advance Authorisation allows duty-free import of inputs that are physically incorporated into the export product, along with fuel, oil, catalysts and packing materials consumed in production. It is designed to make sure exporters do not pay duty on materials that leave India inside their products.

How quantities are fixed

The quantity of inputs allowed is based on Standard Input Output Norms, which set how much of each input is needed to make one unit of a given export product. Where no norm exists, the exporter can apply for a norm to be fixed based on actual consumption.

The export obligation

The holder must export the specified quantity and value of finished goods within the export obligation period, which is generally 18 months from the date of issue, with extensions possible on conditions. The export must also achieve a minimum value addition over the duty-free inputs.

Key conditions

  • Inputs are subject to the actual user condition and generally cannot be sold.
  • Records of consumption must be maintained to show that inputs were used in the export product.
  • The export product and inputs must match the description in the authorisation.

EPCG and Advance Authorisation compared

Feature EPCG Advance Authorisation
What you import Capital goods: machinery, equipment, tools Inputs, consumables and packing materials
Duty benefit Zero customs duty on capital goods Duty-free import of inputs
Export obligation Six times the duty saved, over six years Specified quantity and value of exports, generally within 18 months
Second-hand goods Not allowed Not applicable
Closure Export obligation discharge certificate Redemption of the authorisation

A simple example

Suppose a garment exporter imports sewing and cutting machines under EPCG, and the duty that would otherwise have been payable is ₹10 lakh. The specific export obligation is six times that amount, so the exporter must achieve ₹60 lakh of additional exports over six years, on top of its normal average exports. If the same exporter also imports fabric and trims under Advance Authorisation, those inputs come in duty-free, but the garments made from them must be exported within the obligation period in the quantities set out in the authorisation.

How imports are cleared under these schemes

When goods arrive under EPCG or Advance Authorisation, the Bill of Entry is filed claiming the relevant exemption notification, and the authorisation is registered at the port of import. Customs debits the value and quantity from the authorisation each time goods are cleared. A few points matter at this stage:

  • The authorisation must be registered at the port before the first clearance.
  • The description, quantity and value of goods on the invoice must match the authorisation.
  • A bond and, in some cases, a bank guarantee may be required.
  • Any mismatch can lead to the exemption being denied and duty being demanded on the spot.

Closing the scheme properly

The benefit only becomes final when the obligation is discharged and the authorisation is closed. For EPCG, this is the Export Obligation Discharge Certificate; for Advance Authorisation, it is the redemption of the authorisation. Customs then cancels the bond and releases any bank guarantee.

Keep a single file for each authorisation with all Bills of Entry, Shipping Bills, bank realisation certificates and installation or consumption records. Closing an authorisation years later without organised records is one of the hardest problems exporters face.

What happens if the obligation is not met

If the export obligation is not fulfilled, the holder must pay the duty saved, usually with interest, on the proportion of the obligation not achieved. Penalties may also apply under trade law. Extensions are available in some cases, but they come with fees or conditions. Monitoring progress against the obligation every year avoids surprises near the deadline.

Practical tips

  • Apply for the authorisation before the goods are shipped, so the exemption can be claimed at the time of import.
  • Check that the supplier’s invoice uses the same description as the authorisation.
  • Track exports against the obligation regularly, not just at the end.
  • Do not move scheme machinery to another site without approval.
  • Keep consumption records for Advance Authorisation inputs.

Use export schemes confidently with R K Container Movers Pvt. Ltd.

RKCMPL registers authorisations at the port, files Bills of Entry claiming the correct exemption and keeps clearance records organised for closure later. If you are planning a machinery import or a large input order for export production, speak with our team about clearing it under the right scheme.

Let's move your cargo forward

Tell us what you're shipping and we'll come back with a plan and a quote.

Send an enquiry